112
to that adopted at Tai Wai. It gave was built across the stream, whence the water was conducted in an open channel, 2,100 feet long, to a tank near the sea-shore. From this point, three lines of cast iron pipes, supported on trestles, were laid for a distance of 1,700 feet across the foreshore to where lighters could be loaded at all states of the tide. A large tank, into which the water was to be pumped, was fitted up at Ship Street, arrangements being provided for drawing off the supply. These works were completed, but were not brought into service on account of the rainy season setting in before they could be.
In order to supply additional areas in the central and western low-level district, beyond that already supplied from Tai Wai, works were undertaken for bringing water from a stream at Tai Hang Tung, near Castle Peak Bay and distant 18 miles from Blake Pier. These works comprised the construction of a dam, 1,206 lineal feet of open channel, 2 miles of cast iron pipes, 12 inches in diameter, trestle bridges over ravines, and a trestle pier at the sea shore. Brick tanks, each having a capacity of 34,000 gallons, were constructed to receive the water from this source.
Page 112
...
The remaining text appears to be unrelated to the initial content and seems to be a mix of non-English text, possibly due to OCR errors or misfeeds. As per the instructions, the focus is on correcting the initial English text.
112
to that adopted at Isim Waw. it dave was built a cross the streame, whence the water was conducted in an open channel, 2,100 feet long, to a tank wear the sea-shore. Frbur this point, three lives of
of can lose, supported on frestles, were lait. for a distance of 1,700 fut acros the foreshore to where lighters could be billed at all states of the tide. A Large tank, into which the water was to be
was fitte. pumped, fitted up at Ship St., anticrous top being
ده
provided for drawing off the supply. These works
completed, but were not brought into service on account of the lainy
were
ye avow setting in before they
be
could
In order to supply additional
areas in the central and western Low. level district, beyoued that already supplied from Isic Wan, works cere undertaken for bringing water. from a stream at Toi Hand bling. rear Castle Peak Bay and distant 18 miles from Blake Pier. These work comprised the construction of a haw, 1206 lineal fut of open channel, 2 miles of cast iron pipes, 12 inches in diakuster, trestle bridges over ravine: and a trestle pier at the sea shore. Brick tanks, each having a capasity of 34000 gallous, to receive the water from
A.
this
دد دددد
لمزيد حول در ارو
در تدري لو مقدار عند مرقدها في شر من يا لالة
ساله درآمدی دور بودم و درد در این راد دار
تد
لفحل من له الأعمدة
مسال
انه مريد طول دید درود انسداد
اور الفت مو مداد اباد بنده درام وبسيط.
ارف المدرسة مراة الهدهد
ابردوود
امی بیده در سوری
وود
وادی سنسنان باد
وسوف تسالي شورا د کندهار
No comments yet.
Private notes are available after approval.